Lock Up!

We’ve been oiling the cedar boards and windows which look great, the timber softens the metal Spandek cladding. Pickering Joinery from Geelong supplied the glazed doors and windows.

photo-23-12-16-4-24-39-pm

Western Red Cedar windows, Silvertop Ash above, both yet to be oiled.

photo-23-12-16-4-05-29-pm

Bi-fold western red cedar doors, mechanisms smooth and sturdy.

photo-23-12-16-4-10-11-pm

Cladding going up around internal courtyard to be themed a Japanese garden.

photo-23-12-16-4-05-45-pm

Views to the city.

Photo 23-12-16, 4 05 50 pm (1).jpg

 

Advertisements

Roof on, cladding started

1

Rear two storey section roof on and Proctor wrap installed. Great view of the city from the upstairs living/kitchen dining area.

Lower roof with courtyard inset

5

View to St Brendan’s church and statue unexpected glimpse of the church from living areas

Lovely view through heritage houses back to St Brendans

Courtyard

Lots of natural light and ventilation through internal courtyard

Genkan

Our own Japanese genkan or step up into the house proper, will have timber cupboards for shoes.

Wall Framing

The weather has been against us, but works are slowly progressing upwards, with structural steel framing up and timber wall frames in lower level almost complete.

img_3213

Lower level corridor/stair well looking out rear door to garden. TV/tatami room to left, master bedroom and ensuite to right.

img_3210

Tatami room looking out to garden.

 

img_3217

Awaiting waterproofing and core-filling of block work retaining wall.

Getting closer

To get the project within budget, we reviewed the engineering design to change a large part of the structural steelwork to timber along with deleting some windows and non-essential items. The front floor is changed to timber frame with burnished concrete slab for the lower level, providing some thermal mass. A builder is appointed and we’re on track to start construction in May!!

perspective