Wall Framing

The weather has been against us, but works are slowly progressing upwards, with structural steel framing up and timber wall frames in lower level almost complete.

img_3213

Lower level corridor/stair well looking out rear door to garden. TV/tatami room to left, master bedroom and ensuite to right.

img_3210

Tatami room looking out to garden.

 

img_3217

Awaiting waterproofing and core-filling of block work retaining wall.

Advertisements