Footings Completed 

20 July 2016. All hands on deck for slab pour and concrete stump placing. Wirecon concreting brought in seven concrete trucks to fill the slab and stump holes. The guys were using the helicopter trowel for over three hours to achieve a burnished finish on the slab.

14 July 2016 under slab plumbing, trenches and form work

14 July 2016 blinding concrete placed

20 July 2016 Under slab insulation also to sides placed, membrane and mesh

Concrete placed including set down for ensuite and block retaining walls

Placing stumps


Concrete pump truck